⚉|⚇|⚉ Bathroom Stall Prophets

The Stalls of Higher Thought

Keystone Pipeline = 35 Full Time Jobs and NO Increase in Capacity!

leave a comment »

Tar Sand Sad

If approved, the new Keystone would have the same 36-inch diameter — and the same capacity of 830,000 barrels per day — as the existing segments. That means refineries in Texas and along the Gulf Coast would have at their disposal about the same volume of crude oil to refine after Keystone is built as they do now. TransCanada is expected to spend $3.3 billion building the U.S. portion of the pipeline. – Dallas News

Advertisements

Written by mattliving

November 20, 2014 at 12:53 pm

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: